Projects

Case studies

Delivered systems, described with the figures we are able to publish. Each case study covers the requirement, the engineering solution, the scope of work and the outcome.

Main battle tank driving off the fore ramp of an LCMP1 · 2022Defense · Marine

LCM fore and aft ramp system

Ballistic steel ramps for 4 Turkish Navy LCMs embarked in TCG Anadolu: fore 6 × 5 m / 60 t, aft 2 × 5 m / 20 t, 75 kW HPU, Türk Loydu certified.

Arresting net raised between two lifting towersP2 · 2020Defense · Aviation

Arresting net barrier hydraulic retrofit

Pneumatic to hydraulic conversion for the Turkish Air Force in Kayseri: 600 kg net raised to 3 m in 2 s, for cold-weather reliability.

Consulting

Feasibility studies

Alongside engineering projects, YTEK prepares feasibility studies covering market research, return on investment and investment cost. They are not case studies.

Cover of the feasibility report: Li-ion battery production plant

Li-ion battery production plant

For Aspilsan, prepared with Voytes

Cover of the feasibility report: International approved aircraft maintenance centre

International approved aircraft maintenance centre

Prepared with Voytes

Cover of the feasibility report: Rail battery

Rail battery

For Aspilsan, prepared with Voytes

Have a similar project?

Send us the requirement. We will tell you how we would approach it.

Request a quotation